Thursday, September 17, 2009

A New Chapter

There's almost too much going on here to find the time to blog, but I did manage to snap some pictures in the south addition while the construction workers were out to lunch! Good news: there is a first coat of paint on every floor, flooring already going down in the third floor, and wood trim/crown molding in several rooms. Also, the room and closet doors are being delivered on Friday, which are the last big items to arrive on site to keep the schedule moving along.

The first two pictures are of the new chapter room, a meeting room that stretches the width of the south addition. It's a nice long room with a few windows, french doors that lead to the back patio, and a storage closet for secret sorority stuff. :)

View towards the west end of the chapter room. Notice the ceiling trim, which conceals rope lighting. The black squares in the first bulkhead (top center of the picture) contain electrical wiring that will allow for a projector to be mounted on the ceiling.


View of the opposite end of the chapter room, currently piled with construction tools and supplies.


Mechanical room in the south addition. Five new A/C units and furnaces bring the total number of each in the house to 10!


I probably haven't posted pictures of this area yet. This is the new ADA-compliant bathroom on the first floor, just outside the kitchenette. The bathroom provides an accessible restroom for our guests with disabilities and any future residents who may require this accommodation.


Just another view of the same.

No comments:

Post a Comment